Monday, July 21, 2025

Lowongan Kerja di Pipeline

 Lowongan Kerja di Pipeline Desember 2021

1. Pipeline Engineer di  PT ENERA TEKNIKA UTAMA Jawa Barat    

   Link: https://www.jobstreet.co.id/en/job/pipeline-engineer-3711518?jobId=jobstreet-id-job-          3711518&sectionRank=1&token=0~db1428c5-0d3d-4062-b07f-a27c46dd3a35&fr=SRP%20View%20In%20New%20Tab

2. Procurement Engineer di CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED Jakarta Raya IDR 10,000,000 - IDR    14,000,000 

   Link: https://www.jobstreet.co.id/en/job/procurement-engineer-3728568?jobId=jobstreet-id-job-   3728568&sectionRank=2&token=0~db1428c5-0d3d-4062-b07f-a27c46dd3a35&fr=SRP%20View%20In%20New%20Tab

3. Data Engineer di Dexa Group Tangerang

   Link: https://www.jobstreet.co.id/en/job/data-engineer-3711691?jobId=jobstreet-id-job-   3711691&sectionRank=3&token=0~e44558e4-4845-4968-9b06-4686b4c929bb&fr=SRP%20View%20In%20New%20Tab

4. Data Engineer PT. Ruang Dagang Internasional Jakarta Raya

   Link: https://www.jobstreet.co.id/en/job/data-engineer-3717481?jobId=jobstreet-id-job-   3717481&sectionRank=4&token=0~e44558e4-4845-4968-9b06-4686b4c929bb&fr=SRP%20View%20In%20New%20Tab

5. Test Engineer di PT Nomura Research Institute Indonesia Jakarta Raya IDR 8M - 15M monthly

   Link: https://www.jobstreet.co.id/en/job/test-engineer-3713034?jobId=jobstreet-id-job-   3713034&sectionRank=5&token=0~e44558e4-4845-4968-9b06-4686b4c929bb&fr=SRP%20View%20In%20New%20Tab






















Tuesday, November 9, 2021

Job vacancy Pipeline

Job vacancy Pipeline For You As The professional Skill. 

If you are searching for the job vacancy pipeline, please klik links below:

LINK JOB VACANCY ALL OF THEWORLD      ;

1.  https://www.oilandgasjobsearch.com/browse

2. https://www.jobstreet.co.id/en/job-search/pipeline-jobs/

3. https://www.rigzone.com/a-pipeline-jobs/

4. https://www.orionjobs.com/pipeline-jobs

5. https://www.monsterindia.com/search/pipeline-jobs

6. https://www.nesfircroft.com/jobs/pipeline-1

7. https://in.indeed.com/Oil-Gas-Pipeline-jobs

8. https://in.linkedin.com/jobs/pipeline-engineer-jobs

9. https://www.oilandgasjobsearch.com/jobs-pipeline-jobs-in-europe

10. https://www.indeed.com/q-Gas-Pipeline-Jobs-in-Europe-jobs.html

Please share job vacancy pipeline links to your friends.

Read an other articles at this blog like; pull back string hdd. ok

Monday, November 26, 2018

Video HDD-Horizontal Directional Drilling: Detik-Detik Munculnya Reamer di Entry Pit

PT. Line Inter Cikara

JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI PEMBANGUNAN PIPA TRANSMISI GAS DARI MUARA KARANG-MUARA TAWAR


Video HDD-Horizontal Directional Drilling: Aktifitas di Exit Pit Pluit Landmark

By PT. Titan Energi Abadi

JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI PEMBANGUNAN PIPA TRANSMISI GAS DARI MUARA KARANG-MUARA TAWAR KSO HMP-PERTAGAS 2015




Tuesday, April 18, 2017

Horizontal Directional Drilling (HDD) Method

The Horizontal Directional Drilling Method: A Highlight

Horizontal Directional Drilling (HDD) Method  (https://www.nodig-construction.com)
The directional drilling technique is on the way up at the moment. The application of HDD units enables trenchless installations up to 500 m length. Crossings underneath rivers and other waters are frequently performed. The directional method even makes drillings underneath industry complexes possible. The spectrum of application includes all pipe construction measures within the bounds of gas, district heating and drinking water supply, the installation of pressure lines for sewers as well as cable protection pipes for television or telephone cables, traffic routing systems, emergency call boxes or low, medium, high voltage and optical fibre cables.

Wednesday, February 15, 2017

Job Vacancy buat Welder Pipeline

Peluang Job Vacancy buat Welder Pipeline 

Job Vacancy buat Welder Pipeline 
Lagi puyeng belum dapet kerjaan lagi setelah habis proyek kemaren? Siapa pun dari anda yang sudah terbiasa dapat gaji tiap bulannya, tiba-tiba proyek selesai dan gaji pun hilang. Jangan bermuram durja dan menyesali keadaan, teruslah berusaha karena siapa tahu dengan membuka halaman website ini akan menemukan titik terang. Jika anda sudah beristri dan punya anak, pandai-pandailah menasihati mereka agar jangan tiap hari terus "bernyanyi" karena bon ke warung sebelah sudah bejibun. Sabar..sabar...suatu saat anda akan bergaji lagi hingga kebutuhan sandang-pangan dan pelesir bissa terpenuhi. Segeralah buka website loker online yang membuka job vacancy buat welder pipeline atau kontak ke perusahaan yang dulu pernah anda bekerja.

Sunday, February 12, 2017

Lowongan Kerja Dunia Pipeline Luar Negeri

Peluang Lowongan Kerja Dunia Pipeline Luar Negeri

Lowongan Kerja Dunia Pipeline Luar Negeri
Gaji luar negeri lebih besar daripada gaji dalam negeri. Apalagi dunia pipeline sangat royal dalam memberi gaji kepada man power yang memiliki skill dan kemampuan yang mumpuni. pekerjaan pipeline baik oil maupun gas adalah sangat banyak diumumkan di media internet bagi siapapun yang berminat, terlebih bagi mereka yang memiliki background dunia pipeline sebelumnya. Posisi lowongan kerja dunia pipeline luar negeri adalah sangat beragam mulai dari welder, pipe fitter, QC WI, QC FJC/Sandblasting, radioghrapher, QC NDT, etc.

Lowongan Kerja Natural Gas Pipeline

Lowongan Kerja Natural Gas Pipeline 

Lowongan Kerja Natural Gas Pipeline 
Kerja di bidang Natural gas pipeline adalah sangat menggiurkan karena penghasilan atau gajinya sangat menjanjikan. Tentu saja skill dan keahlian adalah sangat diperlukan sesuai dengan prosedur migas. Biasanya lowongan kerja  natural gas pipeline baik itu konstruksi dan distribusi dari hulu ke hilir atau dari hilir ke masyarakat dan industri, tenaga kerja yang dibutuhkan adalah foreman, surveyor, welder, fitter, helper, QC welding inspector, QC field joint coating, QC NDt (Non-destructive test), applicator FJC, HSE supervisor, HSE man dan flagman, public relation/humas, dsb.

Tuesday, November 1, 2016

Foto Family Gathering KSO-HMP Gas Pipeline Project

Bunga Rampai Foto Family Gathering KSO-HMP Gas Pipeline Project

Bpk. Asep Sutisna Daryatmo (CM KSO-HMP)
& Istri
Perjalanan hidup manusia tidak selamanya linear, datar melankan bersifat siklis dan eskatologis. Begitulah Nietsczhe filsuf Prusia katakan dalam bukunya "also sprach zarathustra": masa bayi (debil)-masa kanak-kanak dan remaja (juvenil)-masa dewasa dan masa tua. Dalam menjalani fase demi fase ada sebuah fase yang merupakan titik puncak yang disebut fase zenith sebagai titik kesempurnaan hidup atau the golden age.

Namun setiap fase tidak berlangsung abadi karena harus menginjak ke fase lainnya yang berujung pada fase kematian. "Sein zum tode", Ada adalah menuju kematian kata Martin Heidegger filsuf Jerman . Ketika kita lahir ke dunia dan menjalani fase demi fase, maka fase kematian sedang mengintai dan menunggu untuk menjalankan perannya. Kematian bukan sebuah momok yang menakutkan, justru yang paling mengerikan adalah kematian dari rasa cinta terhadap sesama yang bersumber dari kemiskinan hati. "The most frightening syndrom in this world is poverty", begitulah kata Gabriel Marcel filsuf Perancis.

Sunday, October 30, 2016

Family Gathering MKMT Gas Pipeline Project

Family Gathering Keluarga Besar MKMT Gas Pipeline Project Puncak Oktober 2016

Bpk. Dody Dewanto (PM KSO-HMP) dan bpk.
Asep Sutisna Daryatmo (CM KSO-HMP) bersama keluarga
dalam acara Family Gathering MKMT Gas Pipeline Project
Bpk. Dody Dewanto (PM KSO-HMP) berbincang dengan
bpk Poegoeh (Deputy PM Pertamina Gas) dalam acara
Family Gathering MKMT Gas Pipeline Project
Gabriel Marcel seorang filsuf Perancis pernah mengatakan bahwa kebutuhan manusia tidak hanya bersifat materialistis, personalistik, teologis dan biologis saja, melainkan juga harus terpenuhinya kebutuhan psikologis seperti hiburan. Dalam rangka memenuhi kebutuhan psikologis ini, management KSO-HMP mengadakan family gathering MKMT Gas Pipeline project di Hotel Royal Safari Garden Hotels & Resort Puncak  21-23 Oktober 2016. Setelah hampir 2,5 tahun bekerja menyelesaikan konstruksi pemasangan pipa gas dari Muara Karang ke Muara Tawar lebih dari 30 KM, maka dirasa perlu untuk menyegarkan kembali batin serta menyuburkan jiwa dengan acara Family gathering MKMT Gas pipeline project ini. Family gathering MKMT gas pipeline project ini sekaligus sebagai Farewell Party (pesta perpisahan) seluruh staff dan crew MKMT Gas Pipeline Project mulai dari jajaran manager hingga level yang paling rendah, OB. Semuanya bersatu-padu dan terlibat dalam acara family gathering MKMT Gas Pipeline project mulai dari keberangkatan, game demi game hingga saatnya pulang tetap bersama dalam suasana suka-cita.

Bpk. H. Tjuk Supriyanto
(GA Manager KSO-HMP) 
Seluruh manager KSO-HMP hadir dalam acara Family gathering MKMT Gas Pipeline Project ini, yakni: bpk Dody Dewanto (Project Manager KSO-HMP), bpk. H. Asep Sutisna Daryatmo (Construction Manager KSo-HMP), bpk. H. Tjuk Supriyanto (General Affair Manager KSO-HMP), bpk. Dolfie Lasut Worotikan (HSE Manager KSO-HMP), bpk. H. A. Nasir (Finance manager KSO-HMP), bpk. H. Witarso (Procurement Manager KSO-HMP), bpk. Desri Ghobah (QC Manager KSO-HMP), bpk. Abdul Hair (Project Control KSO-HMP), bpk. Pram (Engineering Manager KSO-HMP), bpk. Andri (Legal manager KSO-HMP).

Demikian brur & zus, bunga rampai foto acara family Gathering MKMT Gas Pipeline project ini. baca pula postingan sebelumnya tentang Ceremonial N2 Purging Part II di blog ini.

Tuesday, October 11, 2016

Ceremonial N2 Purging Part II

Ceremonial N2 Purging Part II: MKMT Nature Gas Pipeline

Management KSO-HMP pimpinan bpk Ir. Dody Dewanto MT.
(Project Manager KSO-HMP) dalam Ceremonial N2 Purging
Part II
Ceremonial N2 Purging Part II dilaksanakan hari Jumat (07/10/2016) pukul 15.00 WIB di lokasi KP-15 Plumpang Jakarta Utara. Hadir pada acara Ceremonial N2 Purging Part II adalah dari owner yakni management Pertamina Gas (bpk. Budi, bpk Dewo, bpk. Poegoeh, bpk. Agung), sedangkan dari management KSO-HMP adalah bpk Dody Dewanto (Project Manager), bpk. Asep Sutisna Daryatmo (Construction Manager), bpk. Dolfie Lasut worotikan (HSE Manager), bpk. Tjuk Supriyanto (GA Manager), bpk. Desri Ghobah (QC manager), bpk. Pram (Engineering Manager), bpk. Witarso (Procurement Manager), bpk. A. Nasir (Finance Manager), bpk. abdul Hair (Project Control Manager) dan seluruh staff konstruksi dan HSE.

Thursday, October 6, 2016

Golden Joint welding After Swabbing Jr

Golden Joint Welding After Swabbing of hydrotest KP-15 MKMT Natural Gas Pipeline


Welder Yusni Taofiq & Maman Abdurahman dalam Golden Joint
After Swabbing KP-15 MKMT


Grinder Listiyono dan rekannya dalam Golden Joint
After Swabbing KP-15
Setelah proses swabbing of hydrotest KP-0 hingga KP-15 usai Rabu malam (05/10/2016), maka team konstruksi yang dikomandani Asep Sutisna Daryatmo (Construction Manager KSO-HMP) via Spv Subagyo malam itu juga bergerak di beberapa titik pekerjaan yang masih tersisa: KP-0 PJB Muara Karang (crew Jon dan crew Yulianto mengerjakan cutting pig launcher & golden joint by Welder Didi & Syahrul Efendi), KP-02 Taman Jokowi Pluit (Crew Wendi Junaery dengan pemasangan SBV welder Budi Pitoyo, bambang subandi dan Biarno), KP-09 Ancol Damkar ( Crew Octa dengan pemasangan SBV dan by pass connection by Welder Andre Sikumbang dan Sri Untung), KP-15 Plumpang Yos sudarso (crew Minto dengan cutting pig header dan golden joint welding after swabbing).

Saturday, October 1, 2016

Ceremonial N2 Purging

Ceremonial N2 Purging: Fase Pre-Comm Section III & IV KSO-HMP MKMT Project Gas Pipeline

Team Ceremonial N2 Purging MKMT Project Gas Pipeline Project foto bersama
 PM KSO-HMP (bpk Dody Dewanto)
Project Manager KSO-HMP (bpk, Dody Dewanto) bersama
 CM KSO-HMP (bpk. Asep Sutisna Daryatmo), Procurement
Mgr (bpk. H. Witarso), Pro-Cont Mgr (bpk. Abdul Hair) dalam
Ceremonila N2 Purging KSo-HMP
Sementara di KP-23 sedang dilaksanakan pengelasan atau welding golden joint, Kamis pagi pukul 11.00  WIB (29/09/2016) di KP-15 Plumpang sedang dilaksanakan Ceremonial N2 Purging dari KP-15 ke KP-30 oleh team management KSO-HMP. Ceremonial N2 Purging ini adalah hajatan bersama team engineering, QC, construction dan procurement KSO-HMP yang dikoordinir oleh tim HSE dan Humas KSO-HMP atas komando Project Manager KSO-HMP. Ceremonial N2 Purging ini diadakan untuk pertama kalinya selama MKMT Project Gas Pipeline ini dilaksanakan seiring dengan akan dimulainya proses N2 Purging. N2 Purging merupakan fase terakhir dari Pre-Comm (Pre-commissioning) yang berada setelah selesai fase Hydrotest.

Wednesday, September 28, 2016

Management Walk Through Pertamina Gas

Management Walk Through Pertamina Gas, Nusantara Regas, KSO-HMP dan PMC

Management Walk Through Pertamina Gas, Nusantara Regas, PMC & KSO-HMP
Bapak Agung inspeksi pekerjaan crew John
Sejak Rabu pagi hingga tengah hari, beberapa titik pekerjaan MKMT Project Gas Pipeline dikunjungi oleh tim Management Walk Through Pertamina Gas dan Nusantara Regas yang didampingi oleh PMC dan KSO-HMP. Management Walk Through atau site visit ini dimulai dari KP-0 Muara Karang hingga KP-30 Muara Tawar. Tujuan   ini menurut QC Manager Pertamina Gas (bpk. Agung Andriyanto) untuk mengecek kegiatan crusial di beberapa lokasi yang masih belum rampung sebagai persiapan commissioning project atau gas-in

Hydrotest Pre-Comm Section IV

Hydrotest Pre-Comm Section IV: MKMT Project Gas Pipeline


QC Manager KSO-HMP (Desri Ghobah) dan QC PMC (Bambang)
dalam hydrotest Pre-Comm Section IV 
Engineering Manager KSO-HMP (Pram) dan Crews dalam
Hydrotest Pre-Comm Section IV
Hydrotest Pre-comm Section IV usai setelah dalam proses Swabbing, biddy pig dan 5 foam pig muncul di KP-23 KBN pagi pukul 06.47. WIB. Urutan Hydrotest Pre-Comm Section IV telah dilalui satu per satu mulai dari cleaning & gauging, filling water, hydrotest (holding test 24 jam), dewatering dan swabbing, meski dalam proses dewatering ada kendala non-teknis di luar skenario yang telah ditentukan. Kendala itu terjadi karena seal biddy pig menghalangi lubang angin keluar setelah sebelumnya seluruh air termuntahkan keluar. Hal yang paling urgent dalam hydrotest pre-comm section IV ini adalah proses holding test 24 jam, Pressure pump menekan hingga 900 Psi dalam rentang waktu 24 jam, dengan tujuan  untuk mengetest dan mengetahui sampai sejauhmana ketahanan pipa sepanjang 7 KM dari KP-23 KBN hingga KP-30 Muara Tawar.

Thursday, September 22, 2016

Hydrotest Section I After Pullback KP-15 Plumpang

Hydrotest After Pullback Section I KP-15 Plumpang MKMT Project Gas Pipeline

Hydrotest Section I KP-15 Plumpang: bambang QC PMC,
Mgr Engineering KSO-HMP (Pram), QC KSO-HMP (Ilmar),
HSE KSO-HMP (Alwin), QC PMC (Aditya)
Hydrotest Section I KP-15 Plumpang: 
Pressure gauge
Fase Pre-commisioning MKMT Project Gas Pipeline masih terus berlangsung. Salah satu spot yang menjadi titik-fokus fase Pre-comm ini adalah Hydrotest Section I after pullback KP-15 Plumpang yang bermula dari KP-0 PJB Muara Karang. PT. Farell melanjutkan kinerja PT. Bening Tunggal Mandiri dalam Hydrotest Section I KP-15 Plumpang ini. Sejak Selasa malam (20/09) mereka telah menyiapkan peralatan mulai dari Pressure pump, filling water machine, DWT (Dead Weight Tester),
Barton Chart
Recorder
Gauging Manual
Barton Chart Recorder, Pressure gauge,Temperature Indicator, Pressure Recorder, etc. Setelah proses filling water selesai sebanyak 4300 M3, maka persiapan hydrotest pun dilakukan  yakni mulai dari pengecekan kalibrasi semua alat oleh QC KSO-HMP (Fery FM Pilliang & Ilmar) dan QC PMC (Bambang & Aditya). Sekitar pukul 01.00 WIB Sabtu dinihari (23/09) hydrotest dimulai setelah terjadi release karena pressure vessell-nya bocor Jumat (22/09) sekitar pukul 16.00 WIB. Saat ini proses holding 24 jam 860 Psi sedang berlangsung dan diperkirakan usai pukul 02,00 Sabtu (24/09) dinihari nanti.

Management KSO-HMP silih berganti inspect ke pekerjaan Hydrotest Section I after pullback KP-15 Plumpang yakni: Project Manager (bpk Dody Dewanto), QC Manager (Desri Ghobah), QC Engineering (Pram), Procurement manager (Witarso), Construction Manager (Asep Sutisna Daryatmo), GA manager (Tjuk Supriyanto) dan HSE Manager (Dolfie LW).

Crew FJC Ahmad Huzaini 
Gauging Manual
Di lokasi yang sama, crew FJC Ahmad Huzaini (QC Coating KSO-HMP) Kamis siang (22/09) meng-coating string pipa-bending 9 dan 10 degree untuk persiapan Gauging Manual yang dilakukan oleh crew Minto sore harinya pukul 16.00 WIB. jangan lupa baca pula Fabrikasi Golden joint KP-15 Plumpang di blog ini.