Showing posts with label HDD Pasir putih. Show all posts
Showing posts with label HDD Pasir putih. Show all posts

Monday, May 16, 2016

Gas Pipe

Phases of HDD jobs in Gas Pipe Project

HDD  (Ciliwung Lama): Gas Pipe
HDD or Horizontal Directional Drilling is a drilling lines underground of Gas Pipe through the rivers, bridges or buildings that are difficult to pass normally (mainline or opencut). Muara Karang-Muara Tawar of gas pipe projects have made the job HDD namely: HDD Kali Blencong 1 KM, HDD Ancol In, HDD Plumpang, HDD BKT, HDD Kali Begog, HDD PJB, HDD Pluit Laguna, HDD landmark, HDD Gedong Panjang, HDD Pakin , and HDD Lodan.